Skip Navigation Links
The Legislation
Pipeline Integrity Verification Process
MAOP Verification
Pressure Testing
In-Line Inspection

 Pipeline Integrity Verification Process 

PHMSA Draft IVP Flow Chart (July 2013)    

Pipeline Integrity Verification Process - AGA Preliminary Comments (Aug 6, 2013)      

Presentations from PHMSA's Pipeline Integrity Verification Process Public Workshop (Aug 7, 2013):

Integrity Verification Process Perspective: National Transportation Safety Board
Honorable Christopher A. Hart, Vice Chairman
Summary of Natural Gas Transmission Pipelines Annual Report Data
Blaine Keener, National Field Coordinator, USDOT/PHMSA
PHMSA’s Approach for the Integrity Verification Process
Steve Nanney, Senior Engineer, USDOT/PHMSA
NAPSR Perspective on the Integrity Verification Process
Jim Hotinger, Assistant Director, Division of Utility and Railroad Safety, Virginia State Corp. Comm.
Pipeline Safety Trust Perspective
Carl Weimer , Executive Director, Pipeline Safety Trust
Pipeline Operator Presentations - Intrastate
     Intrastate Natural Gas Transmission:
Nick Stavropoulos, Executive Vice President, Gas Operations, PG&E 
    Intrastate Natural Gas Transmission: Bruce Paskett, Principal Compliance Engineer, Northwest Natural Gas
Pipeline Operator Presentations - Interstate 
    Interstate Natural Gas Transmission:
Dwayne Burton, retired V.P. Interstate Gas Pipeline Operations and
       Engineering Group Vice President, Kinder Morgan 
     Interstate Hazardous Liquid: Dave Ysebaert, President and CEO, Explorer Pipeline

Pipeline Integrity Verification Process - AGA Comments (Sep 9, 2013)         

PHMSA IVP Flow Chart - 2nd Draft (Sep 2013)    

Pipeline Integrity Verification Process - AGA Additional Comments (Oct 8, 2013) - includes suggested revisions to flowchart   

 
 

Join the Energy Conversation